Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›TEPCO to Celebrate New Year with First Commercial Turbine
Offshore Wind

December 6, 2018 · about 7 years ago

TEPCO to Celebrate New Year with First Commercial Turbine

Tokyo Electric Power Company Holdings Inc. (TEPCO) is launching its first commercial offshore wind turbine in Choshi, Japan, on 1 January 2019.

1 minutes read
  • LinkedIn
  • X
  • Email

Tokyo Electric Power Company Holdings Inc. (TEPCO) is launching its first commercial offshore wind turbine in Choshi, Japan, on 1 January 2019.

Located south of Choshi in the Chiba Prefecture, the MWT92/2.4 turbine has a 2.4MW rated output and is installed on a bottom-fixed foundation.

TEPCO began conducting research offshore Choshi in August 2009 under a public initiative launched by the New Energy and Industrial Technology Development Organization (NEDO).

Since 2013, the two parties have been testing the country’s first offshore wind power generation facility. During the demonstration, test data was monitored with the aim of confirming technologies necessary to introduce and expand offshore wind projects.

The Japanese company said the demonstration brought experience in operating and maintaining the turbine in harsh weather and marine conditions, as well as ensuring equipment safety and resistance to damage from salt water, which as a result, proved the unit is safe and can be operated at a high capacity factor.

As a result, it was also confirmed that the fairly shallow depths and high winds along the Chiba coast offer excellent conditions for an offshore wind farm.

In mid-November, TEPCO began a seabed survey off the Chiba coast to ascertain the bedrock structure of the seabed for a possible project.

A boring survey offshore Choshi, Asahi, Sosa, and Yokoshibahikari will be carried out until the end of January 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free