Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Yangtze River Dredging Project Complete
Dredging

February 4, 2019 · about 7 years ago

Yangtze River Dredging Project Complete

The Yangtze River maintenance dredging project has passed the acceptance inspection, according to the JXY company. At the handover inspection meeting of the Yangtze River Waterway Maintenance Dredging commission, which was held in late December, the Yujiawan Shoal Dredging Project passed the accepta

1 minutes read
  • LinkedIn
  • X
  • Email

The Yangtze River maintenance dredging project has passed the acceptance inspection, according to the JXY company.

At the handover inspection meeting of the Yangtze River Waterway Maintenance Dredging commission, which was held in late December, the Yujiawan Shoal Dredging Project passed the acceptance check.

The officials indicated that the construction work of the 2018 Yangtze River upstream maintenance dredging project has been fully completed.

During the meeting, the inspection and acceptance teams fully affirmed the work done by all parties involved in the construction, saying that the project met the design requirements and relevant specifications.

Overall, the 2018 Yangtze River dredging project (the Hejiangmen to Fengdu section of the waterway) included dredging of the Maliuqi shoal, the Chayuqi shoal, the Diaoyuzui shoal and the dredging of the Yujiawan shoal.

Previously, dredging of the Maliuqi, Chayuqi and Diaoyuzui were also recognized by the acceptance inspection as fully completed.

JXY company concluded that at this point, the 2018 annual Yangtze River dredging season has fully met the criteria laid down by the government officials.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free