Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Triangle’s Cliff Head well goes offline after pump issue
Fossil Energy

March 13, 2019 · about 7 years ago

Triangle’s Cliff Head well goes offline after pump issue

Triangle Energy has experienced a technical issue with one of the wells at its Cliff Head oil field located offshore Australia, which has caused the well to stop producing.

2 minutes read
  • LinkedIn
  • X
  • Email

Australia-based oil producer Triangle Energy has experienced a technical issue with one of the wells at its Cliff Head oil field located offshore Australia, which has caused the well to stop producing.

The Cliff Head oil field is located in the Perth Basin about 270 kilometers north of Perth and 12 kilometers off the coast of Dongara in Western Australia, at a water depth of 15-20 meters.

The field is produced via an offshore platform connected to the onshore Arrowsmith Stabilisation Plant by twin 14km production and injection pipelines. Crude oil is trucked to BP at its Kwinana refinery south of Perth.

Triangle Energy is the operator and majority owner of the field with a 78.75% interest, with Royal Energy holding an interest of 21.25%.

Triangle informed on Wednesday that a technical issue has occurred during steady state production operations which has caused production well CH13 to stop producing. It has been confirmed, by both company and service personnel, that the issue is associated with the downhole electric submersible pump, Triangle added.

Whilst CH13 remains offline the company anticipates production to stablize at approximately 750 bopd from the other four producing wells.

Triangle experienced a similar issue with the downhole electric submersible pump on another well last year. Namely, a technical issue with the pump caused well CH12H to stop producing back in May 2018. The production from the well was not restored until October last year .

In addition, in July 2018, Triangle’s Cliff Head was hit by severe weather and sea conditions resulting in a loss of produced fluid and the interruption to production . The incident was classified as a low-level oil spill, in the range of zero to 10,000 liters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1JERA deepens Australian LNG foothold with larger stake in Chevron’s project
  2. 2MoU charts the path for tidal and ocean current energy projects in Chile
  3. 3Seadrill hit with $55 million bill after appeals court upholds rig breach ruling
  4. 4Sunda steps closer to dusting off 1985 gas field as New Zealand bid goes exclusive

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free