Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Ørsted Picks G-tec for Geotechnical Work Offshore Germany
Wind Farms

April 1, 2019 · about 7 years ago

Ørsted Picks G-tec for Geotechnical Work Offshore Germany

Ørsted has awarded Belgium’s G-tec with contracts to provide geotechnical engineering services on two offshore wind farms in the German Bight. Under the two individual contracts, G-tec will in 2019 carry out geotechnical investigations and laboratory analysis of samples taken from the seabed in vari

1 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has awarded Belgium’s G-tec with contracts to provide geotechnical engineering services on two offshore wind farms in the German Bight.

Under the two individual contracts, G-tec will in 2019 carry out geotechnical investigations and laboratory analysis of samples taken from the seabed in various depths within the Gode Wind offshore wind farm 03 and 04 and the German Cluster offshore wind farm 01.

For Gode Wind offshore wind farm 03 and 04, the contract includes a detailed geotechnical site investigation on all turbine locations including in-situ tests and sampling, and subsequent onshore laboratory testing. The contract also includes an option for in-situ stiffness measurements.

On German Cluster offshore wind farm 01, G-tec will carry out a preliminary geotechnical site investigation on selected positions of geological interest including in-situ tests and sampling, and subsequent onshore laboratory testing.

Gode Wind 3 and 4 projects have a total capacity of 241.75MW. Gode Wind 3 was selected in the first German offshore wind auction, and Gode Wind 4 in the second auction . The two wind farms are scheduled to be commissioned by 2024/2025, subject to a final investment decision.

The capacity and the potential timeline for the German Cluster offshore wind farm 01 is unknown.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free