Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Tender Released for Kalama Port Dredging Project
Dredging

April 3, 2019 · about 7 years ago

Tender Released for Kalama Port Dredging Project

The Port of Kalama (WA) announced today that the tender for TEMCO Berth Maintenance Dredging Project is open for submissions. The port will be receiving sealed bids at the Port Office, 110 West Marine Drive, Kalama, Washington 98625 until May 3rd, 2019 at 2PM (PST). Bid packets containing plans, spe

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Kalama (WA) announced today that the tender for TEMCO Berth Maintenance Dredging Project is open for submissions.

The port will be receiving sealed bids at the Port Office, 110 West Marine Drive, Kalama, Washington 98625 until May 3rd, 2019 at 2PM (PST).

Bid packets containing plans, specifications, proposal, contract, bond, and detailed instructions to bidders can be find online or at J2 Blue Print Supply Co., located at 8100 NE St. Johns Road, Suite B101, Vancouver, WA.

Overall, the TEMCO Berth Maintenance Dredging Project includes excavation of approximately 55,000 cy of dredged materials by either a hydraulic or mechanical dredge to elevations between -43 feet and -45 feet relative to Columbia River Datum (CRD) with 2-feet of payable over-dredge as directed by the port.

The project also calls for the placement of dredged material into the Washington Beach Nourishment Site or in the upland South Port Site.

The contractor is required to provide unit pricing along with the total costs as outlined in the Bid Form and schedule for completion of dredging.

Selection of the contractor will be based upon Schedule of Prices and Bid Total Including Sales Tax to complete the work. On-site construction will take place between September 1, 2019 and September 30, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fresh North Sea gas discovery yields up to 10 million barrels of oil equivalent
  2. 2Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  3. 3Valaris rigs find more work in North Sea, Australia, and Suriname
  4. 4Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free