Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›JGA South Cable Ready for Subsea Installation
Subsea

April 10, 2019 · about 7 years ago

JGA South Cable Ready for Subsea Installation

RTI Connectivity has said that construction of the Japan-Guam-Australia South Cable System (JGA South) is on schedule and will be commercially available by the end of the year. JGA South has an initial design capacity of 36 terabits per second (Tbps), enabling carrier-neutral data centres in Sydney

1 minutes read
  • LinkedIn
  • X
  • Email

RTI Connectivity has said that construction of the Japan-Guam-Australia South Cable System (JGA South) is on schedule and will be commercially available by the end of the year.

JGA South has an initial design capacity of 36 terabits per second (Tbps), enabling carrier-neutral data centres in Sydney to connect to RTI’s combined cable landing station / neutral data centre in Piti, Guam. From Guam, JGA South connects seamlessly to key cities with neutral data centres including Los Angeles, California, USA, Tokyo, Japan, and Hong Kong, SAR, over the Southeast Asia-United States Cable System (SEA-US), JGA North and the Hong Kong Guam Cable System (HK-G), respectively.

JGA South will also connect to the Sunshine Coast, Queensland, making it the first new cable ever to land on the east coast of Australia, outside of Sydney.

The undersea cable and repeaters are being loaded onto the Ile De Brehat installation vessel at Alcatel Submarine Networks’ (ASN’s) factory in Calais, France before it sets sail to the South Pacific to begin installation.

“ JGA South will be the fastest path to between Sydney-Hong Kong and Sydney-Tokyo. Also, the cable’s second landing to the Sunshine Coast will deliver much needed diversity not only between Australia-Asia and Australia-United States, but also between Brisbane and Sydney ,” RTI chief executive officer, Russ Matulich , said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free