Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Buffalo Bayou Desilting Operations in Full Swing
Dredging

April 25, 2019 · about 7 years ago

Buffalo Bayou Desilting Operations in Full Swing

The Buffalo Bayou desilting program is currently underway in a ‘2 1/2 mile segment’ of the bayou at the north end of Barker Reservoir, the U.S. Army Corps of Engineers’ Galveston District said in its latest project update. The Galveston District grants local drainage and flood control districts ease

1 minutes read
  • LinkedIn
  • X
  • Email

The Buffalo Bayou desilting program is currently underway in a ‘2 1/2 mile segment’ of the bayou at the north end of Barker Reservoir, the U.S. Army Corps of Engineers’ Galveston District said in its latest project update.

The Galveston District grants local drainage and flood control districts easements in local waterways to maintain adequate water flow through those waterways through the removal of sediment and debris.

Fort Bend County Drainage District was issued a permit to desilt this portion of Buffalo Bayou, a segment that drains directly into Barker Reservoir.

Hundreds of thousands of cubic yards of sediment accumulated in this area following Hurricane Harvey and other flood events. Removing this sediment will allow water from upstream to reach Barker Reservoir with less impedance.

Approximately 300,000 cubic yards of sediment are expected to be removed from the bayou, with work expected to be completed in August, said USACE.

The silt from Buffalo Bayou is very wet and must be allowed to drain prior to being hauled off site. It is then allowed time to dry prior to being removed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free