Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›GE Power tech picked for Oman LNG debottlenecking project
Clean Fuel

July 3, 2019 · about 7 years ago

GE Power tech picked for Oman LNG debottlenecking project

GE Power was awarded the tender for supplying the variable speed drive system (VSDS) as one of the key systems to increase the production capacity of the Oman LNG plant, part of the debottlenecking project.

1 minutes read
  • LinkedIn
  • X
  • Email

GE Power was awarded the tender for supplying the variable speed drive system (VSDS) as one of the key systems to increase the production capacity of the Oman LNG plant, part of the debottlenecking project.

After identifying specific areas in the plant that further enhance efficiency and create additional value from surplus gas in the grid, Oman LNG has decided to embark on debottlenecking various systems and optimizing existing compressor train performance at the Oman LNG plant.

The 18-megawatt (MW) two-pole motor will replace the existing 7.5-MW motor.

Ultimately, the debottlenecking project will increase the plant’s overall production at project completion across three trains, GE Power said in its statement.

The VSDS from GE’s Power Conversion business has the capacity to reach the high speed and efficiency needed to increase the compressor train production. Similar footprint and less necessary auxiliary requirements provide flexibility to the plant layout and enable plant integration with its existing compressor string, which in turn reduces the associated infrastructure costs and facilitates a faster execution time.

GE said that to date, 150 GE high-speed systems have been installed, with 4.5 million operation hours accumulated.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Excelerate entrusts FSRU conversion to Seatrium with another on the cards
  2. 2Subsea7 contracts EnerMech for Trinidad and Tobago's subsea development
  3. 3XOCEAN enters strategic alliance in Japan to expand use of USVs
  4. 4Fresh North Sea gas discovery yields up to 10 million barrels of oil equivalent

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free