Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Tidal & Wave Energy›NEMOS Completes Wave Energy Converter Commissioning Works
Tidal & Wave Energy

September 19, 2019 · about 7 years ago

NEMOS Completes Wave Energy Converter Commissioning Works

NEMOS has finalized commissioning works for 2019 Wave Energy Converter (WEC) prototype in Ostend. After the main steel components were delivered, the Power Take-Off System with sufficient data acquisition integration was fitted to the assembly. The belt drive and spring system, that connects the sub

1 minutes read
  • LinkedIn
  • X
  • Email

NEMOS has finalized commissioning works for 2019 Wave Energy Converter (WEC) prototype in Ostend.

After the main steel components were delivered, the Power Take-Off System with sufficient data acquisition integration was fitted to the assembly.

The belt drive and spring system, that connects the submerged to the floating part of the device, were installed and adjusted and the assembly was thoroughly checked and dry tested for the upcoming sea trials, the company explained.

The finalization of the works was performed with several lifting and towing trials in the harbor of Ostend to test and proof the desired simple tow-to-location installation and decommissioning procedure.

“The satisfactory outcome of the lifting and towing tests makes the NEMOS developers confident to begin the Northsea trials within a short time,” NEMOS said.

The 2019 WEC prototype features an 8 x 2 meter floater and a 16 meters long substructure. The prototype will be deployed in Ostend, next to the NEMOS research tower that has been installed on-site to control and surveil the WEC trials.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Tidal & Wave EnergyOperations & MaintenanceTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies earmarks annual spend of up to $17 billion over next five years
  2. 2Fugro performs ultra-deepwater AUV survey off East Malaysia
  3. 3Southeast Asian oil field development clears key environmental hurdle to move toward FID
  4. 4‘Major’ oil & gas player awards Shearwater with three-year contract off South America

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free