Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Hydratight MORSEAL Riser Repair for Shell Nelson
Subsea

September 26, 2019 · about 7 years ago

Hydratight MORSEAL Riser Repair for Shell Nelson

Hydratight has installed two MORSEAL enclosure clamps on the outer diameter of a riser connected to the Shell Nelson platform in the Nelson field located 80 kilometers north east of Aberdeen. These are the first MORSEAL installations for Shell in the North Sea. The MORSEAL clamps have been used to s

1 minutes read
  • LinkedIn
  • X
  • Email

Hydratight has installed two MORSEAL enclosure clamps on the outer diameter of a riser connected to the Shell Nelson platform in the Nelson field located 80 kilometers north east of Aberdeen.

These are the first MORSEAL installations for Shell in the North Sea.

The MORSEAL clamps have been used to seal the riser in two locations, extending the riser service life and enabling Shell to conduct riser repairs at a more convenient time.

According to Hydratight, the MORSEAL clamp is considerably lighter than alternative sealing systems that require additional riser and pipe supports.

The MORSEAL enclosure clamps were installed on the outer diameter of the riser and injected with high grade elastomeric sealant through multiple inlet ports mounted to the clamp, thus ensuring that the sealant is able to completely flow and fill the cavity and reach the leak point.

“ Corrosion is a common problem in offshore environments and can be highly disruptive for platform production ,” says David Tromans , global market development manager – Speciality Services. “ With a typical design life of 5 years, the MORSEAL enclosure clamp gives an operator the flexibility to choose the best time to repair the riser as part of a maintenance shutdown. A MORSEAL with a longer design life is possible, of course. “

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free