Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›IKM Scoops Up Johan Sverdrup Phase 2 Project
Subsea

November 15, 2019 · about 7 years ago

IKM Scoops Up Johan Sverdrup Phase 2 Project

IKM Ocean Design has been awarded Johan Sverdrup Phase 2 pipeline and umbillical detail engineering contract. The contract is a continuation of IKM Ocean Design’s long-term involvement in the Johan Sverdrup project, where the company has been involved in all project stages for both Phase 1 and Phase

2 minutes read
  • LinkedIn
  • X
  • Email

IKM Ocean Design has been awarded Johan Sverdrup Phase 2 pipeline and umbillical detail engineering contract.

The contract is a continuation of IKM Ocean Design’s long-term involvement in the Johan Sverdrup project, where the company has been involved in all project stages for both Phase 1 and Phase 2 of the development since 2013.

Phase 1 of the project consist of four field centre platforms and 3 off subsea water injection templates, while Phase 2 consist of an additional Process Platform at the field centre with subsea development of three different satellite areas. Phase 1 production was initiated in October this year, and Johan Sverdrup Phase 2 Project is scheduled for production start-up Q4 2022.

IKM Ocean Design has been responsible for the design of the infield pipelines and spools during the Phase 1 development. In addition, the work has included an overall responsibility for the field layout including umbilicals, cables and export pipelines.

For Phase 2 of the development, IKM is responsible for the design of all infield pipelines. The infield pipelines includes production lines, gas injection / gas lift lines and water injection pipelines. As for Phase 1, IKM is also responsible for the overall field layout as part of Phase 2 detail design.

CEO of IKM Ocean Design, Peder Hoås, said: “The Johan Sverdrup Phase 2 Project will be a continuation of the good work carried out in earlier phases of the project and gives us the opportunity to further support Equinor and its partners in the design of the field architecture and subsea solutions for the largest oil discovery on NCS for thirty years.

The contract has a duration of three years (until December 2022) for the completion of detailed design, follow-on and supervision for all pipelines and cables in the field, which means that IKM Ocean design then has been involved in the Johan Sverdrup Project for ten years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & MaintenanceProject & TendersResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free