Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Velesto to provide jack-up rig for Mubadala’s Pegaga campaign
Fossil Energy

December 12, 2019 · about 6 years ago

Velesto to provide jack-up rig for Mubadala’s Pegaga campaign

Velesto Drilling has been awarded a contract by UAE-based Mubadala Petroleum for the provision of a jack-up drilling rig for Pegaga development drilling campaign offshore Malaysia.

1 minutes read
  • LinkedIn
  • X
  • Email

Malaysia’s Velesto Drilling has been awarded a contract by UAE-based Mubadala Petroleum for the provision of a jack-up drilling rig for Pegaga development drilling campaign offshore Malaysia.

Velesto said on Wednesday that the contract was for seven firm wells and the contract value was estimated at $30 million.

The contract is expected to start in the second quarter of 2020. Velesto will use its Naga 4 jack-up to undertake the works.

According to information on Bassoe Offshore, the contract will start in May 2020 and end in May 2021. The dayrate estimate is $80,000.

The Naga 4 is a premium independent-leg cantilever jack-up drilling rig that has a drilling depth capability of 30,000 feet and has a rated operating water depth of 400 feet.

Mubadala sanctioned the development of the Pegaga gas field offshore Sarawak Malaysia in March 2018. The Pegaga gas field is located in the Central Luconia province, offshore Sarawak at about 108 meter water depth.

The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket. The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.

The produced fluids will be sent through a new 38 inch subsea pipeline tying in to an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu. First gas is expected in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free