Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Kissimmee River Restoration Continues
Dredging

December 17, 2019 · about 6 years ago

Kissimmee River Restoration Continues

The U.S. Army Corps of Engineers’ Jacksonville District is implementing additional navigation restrictions for boaters along roughly 10 miles of the lower Kissimmee River basin. As reported, USACE continues backfilling operations on the C-38 Canal as part of an ongoing effort to restore historic flo

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Jacksonville District is implementing additional navigation restrictions for boaters along roughly 10 miles of the lower Kissimmee River basin.

As reported, USACE continues backfilling operations on the C-38 Canal as part of an ongoing effort to restore historic flows of the Kissimmee River.

Earlier this summer, the Corps closed a portion of the canal seven miles upstream to three miles downstream of the U.S. Highway 98 bridge located near Basinger approximately 20 miles northwest of Okeechobee.

Now the Corps is advising boaters that the historic oxbows in the vicinity are also closed to navigation.

Barriers have been installed at the closed segments of the river. Boaters can access upstream and downstream segments using boat rams outside the restricted area. The Corps anticipates completing construction in the next 12 months and will reopen the oxbows at that time.

The Kissimmee River restoration project is one of many under construction by the Corps in partnership with the South Florida Water Management District.

Once completed, the Kissimmee River Restoration project will restore the portions of the channelized river back to its natural meandering pattern and provide 130,000 acre-feet of natural floodplain storage.

This will slow the flow of water from the Kissimmee Basin into Lake Okeechobee, thereby slowing down the rise in the lake that often results in high-volume discharges to the Caloosahatchee and St. Lucie estuaries.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  2. 2Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil
  3. 3North Sea appraisal ops up the oil & gas discoveries’ projected size
  4. 4Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free