Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Dredged Sand from Indian Creek Added to Buckroe Beach
Dredging

January 8, 2020 · about 6 years ago

Dredged Sand from Indian Creek Added to Buckroe Beach

Hampton’s Public Works Department has devised a way to add sand to Buckroe Beach and save taxpayers more than $100,000 at the same time. The stormwater team has been working on a project to retain more water and reduce flooding at Indian Creek in the Wythe area. As part of that project, they arrange

1 minutes read
  • LinkedIn
  • X
  • Email
Dredged Sand from Indian Creek Added to Buckroe Beach
Image source: Hampton City

Hampton’s Public Works Department has devised a way to add sand to Buckroe Beach and save taxpayers more than $100,000 at the same time.

The stormwater team has been working on a project to retain more water and reduce flooding at Indian Creek in the Wythe area.

As part of that project, they arranged for dredging the creek. Rather than disposing of the dredged material, they suggested using it to replenish the sand at Buckroe Beach.

The dredging contractor deposited the sand from the creek bottom into a pile on Buckroe Beach.

As part of the city’s plan, the contractor sifts through the dredged material to remove debris before spreading it onto the beach.

However, there was a period over the weekend and early Monday when residents noticed the debris in the sand and became concerned, not knowing that part of the process included sifting and cleaning.

Public Works noted the concern and plans to fence off areas during future sand replenishment efforts, the department said in the release.

In the meantime, Public Works added that the new sand will look considerably darker than the regular sand on the beach, but it will naturally lighten after two to three weeks under the sun.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free