Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Saipem Contracts Cathie for Neart na Gaoithe Work
Offshore Wind

January 9, 2020 · about 6 years ago

Saipem Contracts Cathie for Neart na Gaoithe Work

Cathie Group has secured a contract by Saipem to provide geotechnical assistance for the Neart na Gaoithe (NnG) offshore wind project in the UK. Cathie is in charge of providing the interpretation of the geotechnical conditions encountered at the 450MW wind farm located off the coast of Fife. The UK

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

Cathie Group has secured a contract by Saipem to provide geotechnical assistance for the Neart na Gaoithe (NnG) offshore wind project in the UK.

Cathie is in charge of providing the interpretation of the geotechnical conditions encountered at the 450MW wind farm located off the coast of Fife.

The UK-based company also played a role in the characterization and interpretation of the geophysical and geotechnical data, and the drafting of Geotechnical Interpretative Report alongside providing support in the certification of the proposed foundation design methods.

Saipem’s scope of work includes the EPCI of 54 jacket foundations, two steel foundation jackets for the offshore electrical substations, and the transportation and installation of the relevant topsides.

The jackets will be manufactured partly at a Saipem owned yard and partly in fabrication facilities located in Scotland. Offshore installation activities will be carried out by the crane vessel Saipem 7000.

“We’re glad to be a part of the NnG offshore wind farm, providing dedicated support not only during the initial investigation stages but also during the wind farm foundation design process. We are confident that our geotechnical assistance will help achieving the certification of the proposed geotechnical design of the piles,” said Victor Terente , UK Engineering Manager at Cathie.

Neart na Gaoithe will feature 54 Siemens Gamesa 8MW turbines. The 450MW project is expected to enter offshore construction this summer, with full commissioning in 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free