Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›IHC IQIP Clamps Down On Offshore Wind Order in Taiwan
Offshore Wind

January 17, 2020 · about 6 years ago

IHC IQIP Clamps Down On Offshore Wind Order in Taiwan

IHC IQIP has won a contract to provide 84 jacket pile grippers for an offshore wind project in Taiwan. The company did not disclose the name of the project; however, it did say that the jacket pile grippers will be used to install the wind farm’s 21 jacket foundations in 2020. Based on the informati

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

IHC IQIP has won a contract to provide 84 jacket pile grippers for an offshore wind project in Taiwan.

The company did not disclose the name of the project; however, it did say that the jacket pile grippers will be used to install the wind farm’s 21 jacket foundations in 2020.

Based on the information provided, the grippers will most likely be used on the 109.2MW Changhua offshore wind farm.

Located off the coast of Fangyuan in Changhua County, Central Western Taiwan, Taiwan Power Company’s Changhua project comprises 21 Hitachi 5.2MW turbines installed on jacket foundations.

Jan De Nul and Hitachi are in charge of the overall work covering the manufacturing and installation of the foundations and the turbines at the wind farm.

Jan De Nul’s scope of work includes the design, fabrication and installation of the foundations, wind turbine installation, the supply and installation of cables off- and onshore, as well as for the upgrading of the electrical substation.

Hitachi is in charge of manufacturing, assembly, operation and maintenance, and other work related to the 21 wind turbines.

The wind farm is scheduled to be operational by the end of the year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free