Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Land and Water Crews Busy at Peel Marina Project
Dredging

March 6, 2020 · about 6 years ago

Land and Water Crews Busy at Peel Marina Project

Land and Water Services is currently working on an exciting project at Peel Marina, located in the town of Peel, Isle of Man. Peel Marina is fed by a river system and has been silted up over several years. Whilst there has been some dredging work carried out, the Isle of Man government has been [&he

1 minutes read
  • LinkedIn
  • X
  • Email
Land and Water Crews Busy at Peel Marina Project
Image source: Land and Water

Land and Water Services is currently working on an exciting project at Peel Marina, located in the town of Peel, Isle of Man.

Peel Marina is fed by a river system and has been silted up over several years.

Whilst there has been some dredging work carried out, the Isle of Man government has been developing a solution that will remove 32,0000m³ of silt from the marina.

“We have worked in conjunction with Tony Gee Design to further develop a lagoon on the edge of to the city of Peel. This is capable of holding 16,000m³ of silt and is lined, containing a drainage system and an overflow pipe returning to Peel Marina,” said Land and Water in their latest release.

The Land and Water Services team is currently overseeing construction phase 1 of this project.

“In collaboration with local company Paul Carey and Sons, we are dredging materials from Peel Marina using our specialist road transportable pontoon, mounted with a long reach excavator. This material will be transported from Peel Marina to the lagoon by LAWS bespoke silt trailers, where it will be tipped and stacked by a long reach excavator.”

“When this project reaches completion in 2021/22, we will remove and dispose of the lagoon’s liner, returning the field to its original state,” concluded the company.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free