Advertisement

Dredging

about 6 years ago

Tideway Dredging Deptford Creek

Huge excavators positioned on jack-up barges on Deptford Creek have been dredging the riverbed to prepare for tunnelling in Greenwich, reports the Tideway – the company delivering the Thames Tideway Tunnel. The operation is a key part of Tideway’s work in south-east London to clean up the River Tham

1 minutes read
Tideway Dredging Deptford Creek
Image source: Tideway

Huge excavators positioned on jack-up barges on Deptford Creek have been dredging the riverbed to prepare for tunnelling in Greenwich, reports the Tideway – the company delivering the Thames Tideway Tunnel.

The operation is a key part of Tideway’s work in south-east London to clean up the River Thames and will make it possible to park and fill barges with spoil from the tunnelling operation.

A giant tunnel boring machine (TBM) is set to begin tunnelling from Greenwich this year, creating a 4.5km connection to Bermondsey.

And as Tideway has made a commitment to move as much of the excavated material as possible away from site by river – instead of by road — this means utilising Deptford Creek.

The benefits of moving material by river are profound, reducing the need for HGVs on local roads and drastically reducing the impact on air quality.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.