Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Vermilion set for Corrib IRM campaign
Subsea

April 28, 2020 · about 6 years ago

Vermilion set for Corrib IRM campaign

Vermilion Ireland is planning an inspection repair and maintenance campaign of the Corrib pipeline and associated infrastructure. The work scopes include offshore pipeline and subsea structure inspection, engineering work on well P3. Weather permitting, the works should start on 6th May 2020 and wil

1 minutes read
  • LinkedIn
  • X
  • Email
Vermilion
Edda Sun; Fugro

Vermilion Ireland is planning an inspection repair and maintenance campaign of the Corrib pipeline and associated infrastructure.

The work scopes include offshore pipeline and subsea structure inspection, engineering work on well P3.

Weather permitting, the works should start on 6th May 2020 and will last for approximately 20 days.

The offshore inspection will start at the Corrib field location below and will continue toward shore until the vessel relocats to the inshore inspection extent at safe navigation depth limit.

The near shore inspection will take place at a later date.

Visual and acoustic surveys will be conducted by ROV mounted sensors and cameras located on attendant survey vessels and towed Side Scan Sonar.

The vessel Edda Sun will undertake the deep water surveys and the subsea facilities maintenance and inspection.

It will also carry out the P3 rectification work. All equipment used will be vessel and/or ROV mounted.

Vermilion (operator) holds a 20% operated interest in the Corrib gas field, offshore Ireland. Production at Corrib commenced on December 30, 2015 and the Corrib field constitutes around 95% of Ireland’s natural gas production.

The Corrib gas field is located approximately 83 km off the northwest coast of Ireland.

Gas flows to the Bellenaboy Bridge gas plant through 90 kilometres of pipeline.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaSurveys & InterventionsInfrastructureOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil
  2. 2North Sea appraisal ops up the oil & gas discoveries’ projected size
  3. 3Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  4. 4CNOOC keeping Worley busy on its North Sea assets for five more years

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free