Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Murray Mouth Dredging in Full Swing
Dredging

May 5, 2020 · about 6 years ago

Murray Mouth Dredging in Full Swing

The South Australia’s Murray Mouth dredging program – with the main goal to keep the river connected to the sea – is moving ahead. Under the cleanup plan, Maritime Constructions crews operate two dredges at the Murray Mouth 24/7 in an intensive maintenance effort to keep the significant waterway ope

1 minutes read
  • LinkedIn
  • X
  • Email
Murray Mouth Dredging in Full Swing
Image source: Maritime Constructions

The South Australia’s Murray Mouth dredging program – with the main goal to keep the river connected to the sea – is moving ahead.

Under the cleanup plan, Maritime Constructions crews operate two dredges at the Murray Mouth 24/7 in an intensive maintenance effort to keep the significant waterway open by dredging sand, shell grit and seagrass which accumulates in and around the mouth of the river.

Due to reduced environmental flows from upstream and the high energy coastline moving sand inward, the Murray Mouth can close quickly without good freshwater flows.

“It is important to keep the mouth of the Murray River open and flowing to ensure that the Coorong and Lower Lakes stay healthy as they will otherwise turn hyper-saline and destroy the ecosystem,” said Maritime Constructions.

“Conditions on site are challenging with fast running tides and sand bars developing regularly in this estuarine environment.”

The Murray-Darling Basin Plan, which became law in 2012, set the goal that the Murray Mouth should remain open without the need for dredging 95 per cent of the time.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free