Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Picayune Strand Restoration Project up for Comment
Dredging

May 15, 2020 · about 6 years ago

Picayune Strand Restoration Project up for Comment

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and Proposed Finding of No Significant Impact (FONSI) regarding construction of features of the Picayune Strand Restoration Project (PSRP). The PSRP Draft EA and Proposed FONS

1 minutes read
  • LinkedIn
  • X
  • Email
Picayune Strand Restoration Project up for Comment

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and Proposed Finding of No Significant Impact (FONSI) regarding construction of features of the Picayune Strand Restoration Project (PSRP).

The PSRP Draft EA and Proposed FONSI addresses the construction of design refinements for the Southwest Protection Feature (SWPF) levee with additional conveyance features, and the partial plugging of the Faka Union Canal, which is a change in sequence from the original authorization.

These refinements will provide continued flood risk reduction while increasing freshwater deliveries to downstream estuaries.

The Southwest Protection Feature levee, which will provide continued flood risk reduction for the agricultural lands southwest of the PSRP, must be constructed prior to the plugging of the remainder of the Faka Union Canal, Miller Canal, and Western Stair Step Canal, where most of the project benefits will be realized.

The Corps plans to proceed with award of the construction contracts for both the SWPF levee and conveyance features for the PSRP in late September 2020.

Due to the size and complexity of this project, implementation and construction has been phased throughout multiple years.

The Draft EA and proposed FONSI for regarding construction of features of the Picayune Strand Restoration Project are available for review at USACE website .

The deadline for sending comments on the proposed works is June 12, 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free