Advertisement

Offshore Wind

about 5 years ago

First wind turbine up at Triton Knoll offshore wind farm

The first of a total of 90 offshore wind turbines has been installed at the Triton Knoll offshore wind farm site, located some 32 kilometres offshore Lincolnshire, UK. The wind farm is expected to generate first power this Spring, according to RWE. The 9.5 MW MHI Vestas wind turbines are being insta

1 minutes read
First wind turbine standing at the Triton Knoll project site
Illustration; Triton Knoll OWF; Photo source: RWE

The first of a total of 90 offshore wind turbines has been installed at the Triton Knoll offshore wind farm site, located some 32 kilometres offshore Lincolnshire, UK.

The wind farm is expected to generate first power this Spring, according to RWE.

The 9.5 MW MHI Vestas wind turbines are being installed by DEME, which is using Cadeler’s Wind Osprey jack-up vessel.

The vessel arrived at the project site with the first sets of turbines last week, after loading the components at a turbine pre-assembly and construction base, established by Triton Knoll and Vestas at Able Seaton Port, in Teesside.

The 857 MW wind farm is scheduled for full commissioning in 2022.

Triton Knoll is owned by RWE (59%) and partners J-Power (25%) and Kansai Electric Power (16%), with RWE leading the construction on behalf of the partnership.

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.