Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›8.2 France working on Saint-Nazaire OWF
Offshore Wind

February 9, 2021 · about 5 years ago

8.2 France working on Saint-Nazaire OWF

8.2 France has been appointed to carry out quality monitoring of the assembly of the nacelles, the e-stack, and pre-assembly at the logistics hub in the port area for the Saint-Nazaire offshore wind farm. The company, which started its three-year contract back in April 2020, has deployed three exper

2 minutes read
  • LinkedIn
  • X
  • Email
First Nacelle for the Saint-Nazaire offshore wind farm rolled out at GE's factory in France
GE Renewable Energy

8.2 France has been appointed to carry out quality monitoring of the assembly of the nacelles, the e-stack, and pre-assembly at the logistics hub in the port area for the Saint-Nazaire offshore wind farm.

The company, which started its three-year contract back in April 2020, has deployed three experts and two engineers full-time for the work under the service contract for the 480 MW offshore wind farm also known as Parc éolien de Guérande.

The offshore wind farm – developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board – will comprise 80 GE Haliade 150-6MW turbines, manufactured in France and scheduled to be operational in the summer of 2022.

GE rolled out the first nacelle for the Saint-Nazaire offshore wind farm in September 2020.

Related Articles

Offshore Wind

First nacelle for France’s first offshore wind farm rolls out

2 min read

For the nacelle and e-stack assembly, 8.2 France team will carry out the review of the test plan and production documents, as well as pre-fabrication audit and regular nacelle and e-stack assembly inspection at GE facilities in Saint-Nazaire.

At the pre-assembly site at the port, 8.2 France will perform inspection of the equipment (blade, nacelle, e-stack, tower) prior to load-out, and inspection of calibrated measuring tools.

The company had carried out similar work for the Merkur offshore wind farm in Germany, which also features GE Haliade 150-6MW wind turbines.

In November 2020, 8.2 France joined forces with Dolfines to offer integrated services to the wind energy market, especially the offshore one, by combining their technical expertise in wind turbines, electrical infrastructures and foundations.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTurbinesBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro performs ultra-deepwater AUV survey off East Malaysia
  2. 2Southeast Asian oil field development clears key environmental hurdle to move toward FID
  3. 3‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  4. 4Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free