Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›First GE Haliade 6 MW nacelle arrives at Saint-Nazaire OWF pre-assembly site
Offshore Wind

February 16, 2021 · about 5 years ago

First GE Haliade 6 MW nacelle arrives at Saint-Nazaire OWF pre-assembly site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire. The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be

1 minutes read
  • LinkedIn
  • X
  • Email
The first GE nacelle arriving at the Saint-Nazaire pre-assembly site
Nantes-Saint Nazaire Port

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire.

The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be sent off to the wind turbine pre-assembly site this spring, according to Nantes-Saint Nazaire Port’s social media posts.

GE rolled out the first offshore wind turbine nacelle for the 480 MW Saint-Nazaire offshore wind farm at the factory in September 2020. The company is now expanding the factory to accommodate the assembly of nacelles for the much bigger Haliade-X offshore wind turbines.

Related Articles

Offshore Wind

GE expanding factory in France to house Haliade-X nacelle assembly

1 min read

The Saint-Nazaire offshore wind farm will comprise 80 Haliade 150-6 MW turbines, installed between 12 and 20 kilometres off the coast of the Guérande peninsula.

The 480 MW project, also known as Parc du Banc de Guérande, is scheduled to be operational in 2022 when it will become the first commercial-scale wind farm installed in French waters.

The wind farm is being developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTurbinesWind FarmsBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free