Advertisement

Cabling

about 5 years ago

Intertek delivers feasibility study for the world’s longest subsea power link

London-based Intertek has delivered a permit feasibility study for Xlinks’ subsea cable system between the UK and Morocco. UK-based Xlinks is developing the world’s longest 3.6 GW subsea power link between the UK and Morocco, which will transit through the territorial waters of France, Spain and Por

1 minutes read
subsea power cable
Illustration purposes only

London-based Intertek has delivered a permit feasibility study for Xlinks’ subsea cable system between the UK and Morocco.

UK-based Xlinks is developing the world’s longest 3.6 GW subsea power link between the UK and Morocco, which will transit through the territorial waters of France, Spain and Portugal.

When and if completed, the subsea cable, made up of two 3,850 kilometres rigid bipole HVDC systems, should provide UK with solar power source from the Sahara.

Intertek said it completed the permit feasibility study through a comprehensive consultation process with the relevant authorities in each of the transit countries.

According to the company, it’s final report outlines in detail the process Xlinks must follow to obtain the permits to survey the proposed route, install the cable system and complete the necessary maintenance throughout the project’s operation life.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.