Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Boskalis and Van Oord ready for Harwich dredging project
Dredging

September 27, 2021 · about 5 years ago

Boskalis and Van Oord ready for Harwich dredging project

The dredging works are due to start on the Harwich Haven Channel Deepening Project. On or around September 30, the trailer suction hopper dredger (TSHD) Sospan Dau will start dredging the main channel, disposing material to the beneficial disposal schemes at Horsey Island and Mersea Harbour. The dre

1 minutes read
  • LinkedIn
  • X
  • Email
Boskalis and Van Oord ready for Harwich dredging project
HHA

The dredging works are due to start on the Harwich Haven Channel Deepening Project.

On or around September 30, the trailer suction hopper dredger (TSHD) Sospan Dau will start dredging the main channel, disposing material to the beneficial disposal schemes at Horsey Island and Mersea Harbour.

The dredging contractor is the Boskalis Westminster/Van Oord Joint Venture , appointed by the Harwich Haven Authority (HHA) to carry out the Harwich Haven Channel Deepening Project.

“ The dredge area is a section of the main channel known as area C2 covering the whole width of the main channel and running from about 250m east of the Platters / Pitching Ground buoys to about 1,000m west of the same buoys ,” said HHA.

Dredged material will be disposed of to two beneficial disposal schemes, one on the northern end of Horsey Island (Hamford Water) and to four separate sites in Mersea Harbour (at Cobmarsh Island, Old Hall Marsh, Tollesbury Wick and Packing Marsh Island).

The current program is to start disposal work at Horsey Island on or about 30 September 2021.

According to HHA, disposal will be carried on every high water (weather permitting), day and night, either by direct pumping of material over the bow of the dredger, or via a floating pipeline. Connection of the dredger to the pipeline and positioning the placement end will be carried out by the Multicat MCS Anekke.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness Developments & Projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free