Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›TSHD Shoalway to make space for Everton’s new stadium VIDEO
Dredging

October 28, 2021 · about 4 years ago

TSHD Shoalway to make space for Everton’s new stadium VIDEO

Royal Boskalis Westminster has begun work on another interesting land reclamation project, pumping sand into the Bramley-Moore Dock to make space for Everton’s new stadium. Over the next three months, the company’s hopper dredger Shoalway will deliver over 450,000 cubic metres of dredged sand from L

2 minutes read
  • LinkedIn
  • X
  • Email
TSHD Shoalway to make space for Everton’s new stadium VIDEO
FC Everton

Royal Boskalis Westminster has begun work on another interesting land reclamation project, pumping sand into the Bramley-Moore Dock to make space for Everton’s new stadium.

Over the next three months, the company’s hopper dredger Shoalway will deliver over 450,000 cubic metres of dredged sand from Liverpool Bay and the Irish Sea to the Bramley-Moore Dock.

Everton’s Stadium Development Director, Colin Chong , said: “This is a huge maritime engineering project and, in many ways, the very laying of the foundations for the new stadium. All the preparatory work so far, in raking the dock bed of unwanted materials and the relocation of marine life, has led to this important stage and now the dock itself has been sealed, work has begun on filling the dock.”

“A trailer dredger is connected to a discharge pipeline floating on the surface of the shore, and the sand is then fluidised in a hopper then hydraulically pumped, via the pipeline, over the River Mersey wall to a spreader pontoon within the dock,” added Chong. “This pontoon will then evenly distribute the sand within the dock and displace the water into a neighbouring dock and this continues until the reclamation of land is above the original dock water level.”

Once the dock is infilled with sand, a controlled process will consolidate the upper six metres by dropping a nine-tonne weight, at a frequency of 60 times per minute.

The resulting compacted and rolled surface will then be suitable for the piling process, which begins early next year. This will form the sub-structure of the new 52,888-capacity stadium.

This content is available after accepting the cookies.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness Developments & Projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free