Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›TDI-Brooks wraps up geotechnical survey at Shenandoah field
Fossil Energy

December 29, 2021 · about 4 years ago

TDI-Brooks wraps up geotechnical survey at Shenandoah field

Offshore survey firm TDI-Brooks has completed a geotechnical site investigation for Beacon Exploration & Production (BOE) in the deepwater Gulf of Mexico.

2 minutes read
  • LinkedIn
  • X
  • Email
TDI-Brooks
R/V Gyre; Courtesy of TDI-Brooks

Offshore survey firm TDI-Brooks has completed a geotechnical site investigation for Beacon Exploration & Production (BOE) in the deepwater Gulf of Mexico.

As described, the company conducted a ‘heavy’ geotechnical coring/cone penetration testing (CPT) with its research vessel G yre on the Shenandoah field.

According to TDI-Brooks, the survey included the acquisition of a 20-metre Jumbo Piston coring, 40-metre CPT-Stinger samples and 40-metre Shelby-tube Stinger samples. Other piston, box core and gravity CPT (gCPT) samples were acquired associated with oil and gas export pipelines.

Following completion of the geotechnical coring campaign, TDI-Brooks shipped the soil samples back to its certified soil testing laboratory in College Station, Texas for the post-survey onshore testing and completion of a factual testing report.

The Shenandoah field development project is located in the Walker Ridge (WR) area in water depths of approximately 1,700 metres. The field will be developed as a subsea tieback from a drill centre in WR-51 to a new built floating production system (FPS) located in WR-52.

This summer, South Korea’s Hyundai Heavy was contracted for the design, procurement, construction, and delivery of the FPS and its installation.

Also, the project operator Beacon reached an export agreement with Williams to provide offshore natural gas gathering and transportation services and onshore natural gas processing services to the Shenandoah development.

Facilities to be installed include a five-mile offshore lateral pipeline build from the Shenandoah platform to Discovery’s existing Keathley Canyon Connector pipeline, and additional onshore processing facilities to handle the Shenandoah production, expected in 2023.

Related Articles

Fossil Energy

Hyundai Heavy lands order to build Shenandoah FPS for Gulf of Mexico

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasSubseaSurveys & InterventionsBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free