Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Disappointing results for Carnarvon in Buffalo well
Fossil Energy

January 24, 2022 · about 4 years ago

Disappointing results for Carnarvon in Buffalo well

Carnarvon Energy is disappointed following results from its Buffalo-1- well drilled offshore Timor-Leste, which will now be abandoned.

3 minutes read
  • LinkedIn
  • X
  • Email
Valaris JU-107 on location at Buffalo-10 - Carnarvon
Valaris JU-107 on location at Buffalo-10; Source: Carnarvon

Australia’s Carnarvon Energy is disappointed following results from its Buffalo-10 well drilled offshore Timor-Leste, which will now be abandoned as only residual oil has been encountered.

The Buffalo-10 well was drilled offshore Timor-Leste in the TL-SO-T 19-14 PSC in which Carnarvon holds a 50 per cent interest and its partner Advance Energy holds the other 50 per cent interest. The well was spud at the end of December 2021, using the Valaris JU-107 jack-up rig.

Last week, Carnarvon requested a trading halt of its shares pending news on the results of its operated Buffalo-10 well. The company also said the 9 5 /8” casing had been cemented in place and drilling had reached total depth of around 3,415 metres Measured Depth (MD) in the 8 ½” hole section. Observations from Logging While Drilling (LWD) tools identified that the primary reservoir was intersected, with indications of hydrocarbons as anticipated in the Elang. The well was then prepared for undertaking wireline logging operations.

In its latest update released on Monday Carnarvon said that, since the last report, the wireline logging operations have been completed with the oil column deemed to be residual and uncommercial. The well will be left in a safe condition and the rig demobilised.

Carnarvon Energy Managing Director and CEO, Adrian Cook , said: “The results from Buffalo-10 well are disappointing for the Carnarvon team and shareholders, but now our attention moves to the commencement of the high impact Pavo-1 and Apus-1 exploration wells within the next month in the Bedout basin.”

Leslie Peterkin , CEO of Advance Energy, also expressed disappointment and surprise with the Buffalo well results, “given the independently verified risk assessment which confirmed a highly likely commercial outcome from the well.”

Peterkin added: “The post-well evaluation indicates that the well was drilled into the hanging wall of a fault, although uncertainty in seismic resolution also contributed to the reservoir being significantly deeper than expected at this location. It is not the case that this result means that all of the attic oil volumes certified by RISC have been negated. The Buffalo Joint Venture will conduct further technical analysis in the coming weeks to fully understand why the attic was not encountered as prognosed at the drilled location.”

As stated by Peterkin, it is likely that the JV will relinquish the Buffalo asset as neither company wishes to fund a second appraisal well in the field.

“Our immediate priority will be to significantly reduce costs while we assess the next steps for the growth of the company,” he concluded.

Related Articles

Fossil Energy

Santos getting ready for two wells near Dorado field

2 min read

When it comes to the other two wells Carnarvon is preparing for, these two wells are located near the Dorado field offshore Australia and Carnarvon is Santos’ partner in the project. The Noble Tom Prosser jack-up drilling rig will be in charge of drilling operations. The rig was hired in March 2021 with expectations to start the drilling programme in late 2021. However, the beginning of drilling operations was somewhat delayed and, in December 2021, it was expected to start this January.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy
  2. 2LNG-to-FSRU conversion widening Karpowership-backed Kinetics’ gas infrastructure fleet
  3. 3Potential for tidal lagoon in South East Wales being explored
  4. 4After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free