Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›NKT commissions Hornsea Two power cable system
Cabling

April 26, 2022 · about 4 years ago

NKT commissions Hornsea Two power cable system

NKT has commissioned the 220 kV HVAC power cable system connecting the 1.3 GW Hornsea Two offshore wind project in the UK to the shore. NKT manufactured the power cables for the project at its factory in Karlskrona, Sweden, which runs on 100% green electricity, minimizing the carbon footprint of the

2 minutes read
  • LinkedIn
  • X
  • Email
NKT commissions Hornsea Two power cable system
NKT

NKT has commissioned the 220 kV HVAC power cable system connecting the 1.3 GW Hornsea Two offshore wind project in the UK to the shore.

NKT manufactured the power cables for the project at its factory in Karlskrona, Sweden, which runs on 100% green electricity, minimizing the carbon footprint of the cable system.

The installation of the subsea cables was completed by the cable-laying vessel NKT Victoria .

“Constructing a project of this size and scale is only possible through strong collaboration, hard work, and dedication. We work very closely with our partner companies and have the finishing line in sight as we install the remaining turbines and continue testing, commissioning, and energising Hornsea 2,” said Patrick Harnett , Ørsted’s programme director for Hornsea 2.

NKT is in charge of the design, engineering, manufacturing, cable-laying, installation and testing of 196 kilometres of the 220 kV HVAC offshore power cable system for Hornsea Two under a contract won back in 2018 .

The 1.3 GW project, comprising 165 Siemens Gamesa 8 MW turbines located 89 kilometres off the Yorkshire coast, generated its first power in December 2021.

Ørsted recently signed an agreement to divest 50% of Hornsea Two to a consortium comprising AXA IM Alts and Crédit Agricole Assurances for GBP 3 billion (approximately EUR 3.6 billion).

Once fully operational later this year, Hornsea Two will be the world’s largest operating offshore wind farm.

Follow Offshore Energy’s Subsea on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingGridOffshore WindSubseaWind FarmsBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free