Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Logan completes space-saving CT reeler project for OneSubsea
Subsea

August 9, 2022 · about 4 years ago

Logan completes space-saving CT reeler project for OneSubsea

Logan Industries, a designer, manufacturer, field service and repair company, has delivered a space-saving coiled tubing (CT) reeler suite for OneSubsea, designed to maximize profitability. As explained, Logan’s CT reelers are coiled tubing winches, where the reelers provide full torque control for

2 minutes read
  • LinkedIn
  • X
  • Email
Logan completes space-saving CT reeler project for OneSubsea
Courtesy of Logan

Logan Industries, a designer, manufacturer, field service and repair company, has delivered a space-saving coiled tubing (CT) reeler suite for OneSubsea, designed to maximize profitability.

As explained, Logan’s CT reelers are coiled tubing winches, where the reelers provide full torque control for the tubing without the need for a standard injector head.

This reduces space required compared to standard tubing reeler/injection head combination and allows for a larger fluid storage footprint on deck.

When the equipment required to handle CT has a small footprint, more deck space can be dedicated to hauling fluid, which increases profitability for the operator, Logan said.

According to Logan, this is the first unit which was delivered with a removable drum, which means the unit footprint can remain static on the vessel while the drums can be taken to a shore base for unspooling and respooling.

CT was provided on the drum, with live swivel and isolation valves on the unit. The suite of equipment included a spare drum, adapter to allow it to fit into most tubing service spoolers at the tubing manufacturer’s facilities, transport basket and lifting set along with the reeler, HPU, control stand and interconnect lines.

The company also provided a purpose-built overboarding platform with a translating / clamshell to accommodate OneSubsea’s end connection philosophy.

“We placed a work deck, dimple connector, test tool, controls and safeguards on this overboarding platform to give the crew plenty of access to the volume of space under the overboarding point. The overboarding platform also provided a reeler deck loading spreader effect on the vessel’s deck”, said Dean Carey , technical director at Logan.

“We believe this is truly the next evolution in coiled tubing deployment offshore and provides significantly more convenience for our customers. This is one of the most comprehensive reeler equipment suites Logan has had the pleasure to provide, and we expect it to remain in service for quite some time.”

Related Articles

Subsea

Logan delivers second set of new CT reelers for well interventions

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness Developments & Projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free