Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Corio, TotalEnergies award FEED contract for 504 MW floating wind farm in South Korea
Cabling

August 17, 2022 · about 4 years ago

Corio, TotalEnergies award FEED contract for 504 MW floating wind farm in South Korea

Corio Generation and TotalEnergies have selected a consortium comprising Technip Energies, Subsea 7, and Samkang M&T to perform Front-End Engineering Design (FEED) for their 504 MW floating wind project in South Korea. The contract covers engineering for the floating foundation, mooring, and inter-a

2 minutes read
  • LinkedIn
  • X
  • Email
A visualization of a floating wind farm with Technip Energies' technology
Technip Energies

Corio Generation and TotalEnergies have selected a consortium comprising Technip Energies, Subsea 7, and Samkang M&T to perform Front-End Engineering Design (FEED) for their 504 MW floating wind project in South Korea.

The contract covers engineering for the floating foundation, mooring, and inter-array cable in collaboration with a wind turbine supplier.

The design of the floating foundation will include Technip Energies’ in-house floater technology INO15™, a three-column semi-submersible floater with a capacity of 15 MW and suited for large series production, according to the company.

For Technip Energies, this contract comes only a few months after the company was awarded FEED work by Equinor for its 800 MW Firefly floating wind project offshore South Korea. The contract with Equinor also includes Technip Energies’ INO15™ technology for the design of the substructures.

Corio and TotalEnergies’ floating wind farm, called Ulsan Gray Whale 3, is planned to be built around 60 to 70 kilometres from Onsan Port in Ulsan.

The project is one of the three phases of the 1.5 GW offshore wind development that the partners are developing off the coast of Ulsan.

A year ago, Corio Generation and TotalEnergies obtained an electric business license (EBL) from the Ministry of Trade, Industry and Energy’s Electricity Regulatory Commission for the project’s first phase of 504 MW.

According to the developers, this was the first floating offshore wind project in Korea to be awarded an EBL.

Upon being granted the licence last year, the companies said that detailed environmental impact assessments would commence immediately on the first phase, with construction expected to start in 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDeepwater InstallationOffshore WindSubseaWind FarmsBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free