Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid›Fugro to work on first Mediterranean floating offshore wind project
Grid

September 1, 2022 · about 4 years ago

Fugro to work on first Mediterranean floating offshore wind project

Fugro has won a contract with Renexia to carry out surveys at the 2.8 GW Med Wind project, the first floating offshore wind project in the Mediterranean. Fugro will perform marine geophysical and environmental surveys to acquire comprehensive geo-data at the proposed wind farm location in water dept

2 minutes read
  • LinkedIn
  • X
  • Email
Fugro gets contract for first Mediterranean floating offshore wind project
Fugro

Fugro has won a contract with Renexia to carry out surveys at the 2.8 GW Med Wind project, the first floating offshore wind project in the Mediterranean.

Fugro will perform marine geophysical and environmental surveys to acquire comprehensive geo-data at the proposed wind farm location in water depths of 300 to 900 meters and along the two proposed export cable corridors.

Once the necessary geo-data is acquired, the results of the analysis will be used to advise on geohazard risk mitigation and identify a safe route for the installation of the two export cables.

These results will also feed into the final integrated environmental impact assessment (EIA) application to Italy’s Ministry of Energy Transition.

“We are really proud to support Renexia in this challenging floating offshore wind project, which will help our country’s transition to decarbonisation and a sustainable future of green energy and power diversification,” said Rodolfo D’Addario , country manager for Fugro in Italy.

The Med Wind project will feature 190 turbines covering an area of 850 km 2 , located 60 kilometers off the Italian coast

Construction of the 2.8 GW floating offshore wind project is expected to start by 2025, with commissioning planned on 1 January 2026.

To remind, the first offshore wind farm built in Italy, as well as the first such project in the Mediterranean, was completed, commissioned and inaugurated earlier this year.

The 30 MW Beleolico offshore wind farm, which features ten MySE3.0-135 turbines delivered by MingYang Smart Energy, was also developed by Renexia.

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

GridOffshore WindSubseaSurveys & InterventionsWind FarmsBusiness & FinanceBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free