Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›PanGeo wraps up offshore gig at two Finland-Estonia links
Cabling

September 7, 2022 · about 4 years ago

PanGeo wraps up offshore gig at two Finland-Estonia links

PanGeo Subsea has completed cable depth of burial (DOB) surveys along the EstLink 1 and EstLink 2 interconnector cables that connect Finland’s and Estonia’s electrical networks. The Kraken Robotics subsidiary used its SeaKite remotely operated towed vehicle (ROTV) equipped with the patented Sub-Bott

1 minutes read
  • LinkedIn
  • X
  • Email
PanGeo wraps up offshore work at two Finland-Estonia links
Nordic Investment Bank

PanGeo Subsea has completed cable depth of burial (DOB) surveys along the EstLink 1 and EstLink 2 interconnector cables that connect Finland’s and Estonia’s electrical networks.

The Kraken Robotics subsidiary used its SeaKite remotely operated towed vehicle (ROTV) equipped with the patented Sub-Bottom Imager (SBI) to carry out the work.

PanGeo supported marine survey provider Arctia Meritaito onboard the research vessel (RV) Mintis to conduct cable depth of burial along the two interconnector cables.

The SBI produces a 3D acoustic image of the cable exterior to a depth of 5 meters below the seabed. It is non-intrusive, allowing the cables to remain fully operational during survey operations, PanGeo said.

The SeaKite ROTV has an integrated SBI, which is said to enable 3D acoustic surveys at speeds up to 4kts and allows the use of a much smaller survey vessel.

The 350 MW EstLink 1 HVDC link was installed in 2006 and crosses the 75-kilometer wide Gulf of Finland, reaching a maximum water depth of 100 meters.

EstLink 2 is a 650 MW, 145-kilometer cable installed in 2013 and is located approximately 70 kilometers east of EstLink 1.

Related Articles

Cabling

PanGeo picks up over $3 million in Sub-Bottom Imager contracts

2 min read

Follow Offshore Energy’s Subsea on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaSurveys & InterventionsBusiness & FinanceBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects
  2. 2Tekmar nets €6 million contract extension in offshore wind
  3. 3Japanese shipping major enters CCS realm in Norway
  4. 4Shell bets big on Canada with go-ahead for LNG project expansion, doubling capacity to 28 mtpa

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free