Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Site investigations start for 2 GW offshore wind project in Scotland
Offshore Wind

April 17, 2023 · about 3 years ago

Site investigations start for 2 GW offshore wind project in Scotland

Fugro is set to deploy its Seawatch floating LiDAR, surface metocean equipment buoys and seabed landers at the offshore site in Scotland where ScottishPower Renewables plans to build its 2 GW MachairWind offshore wind farm, with seabed surveys scheduled to start this summer. Using the Forth Warrior

2 minutes read
  • LinkedIn
  • X
  • Email
Site investigations start for 2 GW offshore wind project in Scotland
ScottishPower Renewables

Fugro is set to deploy its Seawatch floating LiDAR, surface metocean equipment buoys and seabed landers at the offshore site in Scotland where ScottishPower Renewables plans to build its 2 GW MachairWind offshore wind farm, with seabed surveys scheduled to start this summer.

Using the Forth Warrior vessel, this month, Fugro will install the equipment at two separate locations within the project area which ScottishPower Renewables secured in the ScotWind seabed leasing round in 2022.

The developer was awarded seabed rights for three projects in last year’s auction in Scotland, two of which are for floating wind projects being developed in partnership with Shell, the 3 GW MarramWind off the north-east coast of Scotland and the 2 GW CampionWind off the east coast of Scotland.

The 2 GW MachairWind, whose wind turbines will be installed on fixed-bottom foundations, is planned to be built off the coast of Islay.

In the summer of this year, ScottishPower Renewables plans to commence geophysical and environmental survey works within the wind farm development area to gather data about the seabed conditions. Further survey work of this kind is planned for next summer, both within the wind farm array area and the export cable corridor.

MachairWind’s export cable will connect to a substation at an onshore location on the mainland of southwest Scotland, with National Grid expected to confirm where this connection point will be in 2023.

According to information about the project on ScottishPower Renewables’ website, the specific type of wind turbine that will be used is yet to be determined and the number of turbines will depend on the technology selected as part of the future detailed project design.

The developer aims to submit an application for planning consent around the mid-2020s and to start construction on the MachairWind project in the mid-to-late 2020s.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindSubseaSurveys & InterventionsWind FarmsBusiness Developments & Projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free