Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›JDR wins inter-array cable work on largest US offshore wind farm
Cabling

December 3, 2024 · about 1 year ago

JDR wins inter-array cable work on largest US offshore wind farm

DEME Offshore has contracted JDR Cable Systems, part of the TFKable Group, for cable installation and commissioning work on the Coastal Virginia Offshore Wind (CVOW) project. The 2.6 GW CVOW, developed by Dominion Energy, is the largest offshore wind farm under construction in the United States. Und

2 minutes read
  • LinkedIn
  • X
  • Email
An aerial photo of JDR Cable Systems' facility in Houston, Texas
JDR Cable Systems’ facility in Houston, TX, U.S.; Photo courtesy of JDR Cable Systems

DEME Offshore has contracted JDR Cable Systems, part of the TFKable Group, for cable installation and commissioning work on the Coastal Virginia Offshore Wind (CVOW) project. The 2.6 GW CVOW, developed by Dominion Energy, is the largest offshore wind farm under construction in the United States.

Under the contract, JDR will carry out pull-in, termination, testing, and commissioning of all the 66 kV subsea inter-array cables for the offshore wind farm which will comprise 176 wind turbines and three offshore substations.

The inter-array cables for the 2.6 GW project are being supplied by Prysmian and Hellenic Cables.

Related Articles

DEME and Prysmian land €1.6 billion offshore wind contract in US

Hellenic Cables delivers for Dominion Energy Project & Tenders JDR Cable Systems will start its part of the work in 2025 and continue into 2026 .

Across three campaigns, the company will winch and pull the cables from the seabed to the turbines, and then fit electrical connectors and perform termination testing to ensure secure connections. For testing and commissioning, high voltage tests and final inspections will be conducted to confirm the integrity of the cables, ensuring they are ready for reliable power transmission, the company said on December 3.

After winning the contract, Brian Davis , Head of Services at JDR, said: “The Coastal Virginia Offshore Wind project represents a major step forward in the US’s renewable energy strategy, and we are proud to be a part of it. This contract underscores our high-quality end-to-end service for offshore wind projects. JDR’s comprehensive installation and commissioning services will support the long-term success and sustainability of this groundbreaking project.”

The CVOW offshore wind farm, being built 27 miles (around 43.5 kilometers) off the coast of Virginia Beach, is well under construction with the first installation campaign completed in November.

At the beginning of November, Dominion Energy said that 78 monopile foundations and four offshore substation foundations were installed with the offshore wind project now 43% complete.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro performs ultra-deepwater AUV survey off East Malaysia
  2. 2Southeast Asian oil field development clears key environmental hurdle to move toward FID
  3. 3‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  4. 4Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free