Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›New FPSO en route to join six other units at Petrobras’ deepwater field (Gallery)
Fossil Energy

July 15, 2025 · about 1 year ago

New FPSO en route to join six other units at Petrobras’ deepwater field (Gallery)

A floating production storage and offloading (FPSO) unit has left Seatrium’s yard in Singapore for a field in Brazil’s Santos Basin operated by the country’s state-owned energy major Petrobras.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO P-78
FPSO P-78; Source: Petrobras

A floating production storage and offloading (FPSO) unit has left Seatrium’s yard in Singapore for a field in Brazil’s Santos Basin operated by the country’s state-owned energy major Petrobras.

As disclosed by Petrobras, FPSO P-78 left Seatrium’s Benoi shipyard in Singapore on July 13 and is headed to the Búzios oil field in the pre-salt Santos Basin. Since the unit will have a crew onboard during towage to the location, production is expected to start around two weeks earlier than planned.

According to the Brazilian giant, transportation with a crew onboard allows complex FPSO systems to be maintained in operational condition and the commissioning process to continue, reducing the total time between arrival at the final location and the start of oil production.

The P-78 unit has a production capacity of 180,000 barrels of oil and can compress 7.2 million cubic meters of gas per day. Once first oil is achieved, scheduled for December 2025, the field’s current installed production capacity will increase by approximately 18%, to around 1.15 million barrels per day.

After the vessel’s hull was constructed at shipyards in China’s Yantai and Hayang, China, and South Korea’s Ulsan, the FPSO was transported to the Singaporean shipyard. The topside modules, built at Brazil’s Seatrium Angra dos Reis Shipyard, formerly Brasfels, China, and Singapore, were integrated and commissioned there.

On June 30, Petrobras’ Director of Exploration and Production, Sylvia Anjos , and Director of Engineering, Technology, and Innovation, Renata Baruzzi , visited the P-78 platform at the shipyard in Singapore. They participated in the vessel’s sailaway ceremony .

Related Articles

Fossil Energy

Seventh FPSO prepares to join Petrobras’ Santos Basin field

2 min read

The Búzios field is located in the ultra-deep waters of the Santos Basin in water depths of up to 2,100 meters, 180 kilometers off the coast of Rio de Janeiro state. Six FPSOs are already working there: P-74, P-75, P-76, P-77, Almirante Barroso, and Almirante Tamandaré .

The field was discovered in 2010 and began operating in 2018. Petrobras is the operator (88.98% interest) on behalf of the Búzios Shared Reservoir Consortium, comprising CNOOC (7.34%) and CNPC (3.67%), with Pré-Sal Petróleo S.A. (PPSA) as the manager.

The project has 13 wells: six producing wells (with two convertible to injectors), six water-alternating-gas (WAG) injectors, and one gas injector. FPSO P-78 will be interconnected with rigid pipelines for gas production, injection, and export, and flexible pipelines for service and gas lift lines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free