Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›New research project looking to minimize failure and repair costs of floating wind dynamic cables, mooring lines
Cabling

July 25, 2025 · about 1 year ago

New research project looking to minimize failure and repair costs of floating wind dynamic cables, mooring lines

A new project has been launched in the UK to improve the effectiveness of mooring lines and dynamic cables on floating offshore wind farms. Historically, mooring repair costs for oil production assets have exceeded GBP 400 million (approximately $542 million; €461 million) for a single incident, whi

2 minutes read
  • LinkedIn
  • X
  • Email
WindFloat leaving Lisnave dock after construction near Setúbal, Portugal
Image courtesy of Principle Power; WindFloat leaving Lisnave dock after construction near Setúbal, Portugal

A new project has been launched in the UK to improve the effectiveness of mooring lines and dynamic cables on floating offshore wind farms.

Historically, mooring repair costs for oil production assets have exceeded GBP 400 million (approximately $542 million; €461 million) for a single incident, while cable failures have accounted for between 70% and 80% of UK offshore wind insurance claims, according to the Offshore Renewable Energy (ORE) Catapult, which commissioned the new project.

The Mooring Line and Dynamic Cable Monitoring and Replacement Methodologies project will be delivered by ORE Catapult’s Floating Offshore Wind Centre of Excellence, Apollo Engineering and DOF Subsea UK.

ORE Catapult says that the floating wind industry needs a stronger understanding of component failure modes, the time and cost of repairs, and their impact on operational expenses, to successfully transition to commercialization.

“ Operating and maintaining a floating offshore wind farm creates challenges not previously faced in fixed offshore wind, including the monitoring and replacement of mooring lines and dynamic cables “, said Sean Snee , Floating Offshore Wind Team Leader at ORE Catapult.

“More data is required to accurately assess key component failures and what leads to them. In identifying preventative measures and innovative technologies, the learnings from this project could reduce the overall cost of floating offshore wind mooring line and dynamic cable repairs and replacement across the UK and internationally.”

ORE Catapult launched the Floating Offshore Wind Centre of Excellence in 2019, with the aim of developing an internationally recognized centre of excellence that will work to reduce the cost of energy from floating wind, accelerate the build-out of floating wind farms, create opportunities for the UK supply chain, and drive innovations in manufacturing, installation and operations and maintenance.

Related Articles

UK Gets Floating Offshore Wind Centre of Excellence
Offshore Wind

UK Gets Floating Offshore Wind Centre of Excellence

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro performs ultra-deepwater AUV survey off East Malaysia
  2. 2Southeast Asian oil field development clears key environmental hurdle to move toward FID
  3. 3‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  4. 4Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free