Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Seaway7 signs cable installation contract for Formosa 4 offshore wind farm, secures work on Formosa 6
Cabling

September 2, 2025 · about 1 year ago

Seaway7 signs cable installation contract for Formosa 4 offshore wind farm, secures work on Formosa 6

Synera Renewable Energy (SRE) has awarded a contract to Seaway7, part of the Subsea7 Group, for the transport and installation of 35 inter-array cables at the Formosa 4 offshore wind farm in Taiwan, with offshore work expected to commence in 2028. Announcing the contract award, Subsea7 said this was

1 minutes read
  • LinkedIn
  • X
  • Email
Seaway Moxie at an offshore wind farm
Seaway 7/Subsea 7

Synera Renewable Energy (SRE) has awarded a contract to Seaway7, part of the Subsea7 Group, for the transport and installation of 35 inter-array cables at the Formosa 4 offshore wind farm in Taiwan, with offshore work expected to commence in 2028.

Announcing the contract award, Subsea7 said this was a “substantial contract”, which the company defines as being between $150 million and $300 million (approximately between €129 million and €258 million).

“We are looking forward to supporting SRE on the Formosa 4 project and being able to continue contributing to the Taiwanese offshore wind targets with our 7th contract award since entering the Taiwanese market in 2019” , said Stuart Fitzgerald , Seaway7’s CEO.

SRE has also selected Seaway7 as the preferred supplier for the transport and installation of 57 inter-array cables on the Formosa 6 offshore wind farm. A contract for this project is expected to be finalized in 2026.

The 495 MW Formosa 4 offshore project site is located approximately 20 kilometers off the coast of Miaoli County, Taiwan, and will comprise 35 Siemens Gamesa 14 MW wind turbines.

Related Articles

Formosa 6 site is located off the coast of Xianxi Township, Changhua County and marks SRE’s first offshore wind project in central Taiwan. The developer secured the 800 MW development capacity for Formosa 6 in Phase 3.2, the second auction round of Taiwan’s Phase 3 Zonal Development, in mid-2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsBusiness Developments & Projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro performs ultra-deepwater AUV survey off East Malaysia
  2. 2Southeast Asian oil field development clears key environmental hurdle to move toward FID
  3. 3‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  4. 4Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free