Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Fugro set for maintenance survey of 40-year-old interconnector
Cabling

May 14, 2026 · about 4 months ago

Fugro set for maintenance survey of 40-year-old interconnector

Fugro is set to deploy its geophysical vessel in a couple of days to carry out a maintenance survey of an interconnector between France and the UK that has been operating since 1986. The 2 GW IFA 2000 high voltage direct current (HVDC) electrical interconnector is approximately 70 kilometers long, w

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro set for maintenance survey of 40-year-old interconnector
Source: National Grid Ventures’ Notice to Mariners (NtM)

Fugro is set to deploy its geophysical vessel in a couple of days to carry out a maintenance survey of an interconnector between France and the UK that has been operating since 1986.

The 2 GW IFA 2000 high voltage direct current (HVDC) electrical interconnector is approximately 70 kilometers long, with 45 kilometers being subsea.

Fugro Frontier has been appointed to perform a geophysical survey in the North Sea from the nearshore limit of the IFA 2000 cable south of Dover and extending west offshore to the French border on behalf of National Grid Ventures.

The survey will include the full coverage of dedicated survey lines with a geophysical survey system, multibeam echo sounder and towed sidescan sonar, and will provide seabed bathymetry and sidescan sonar data along the route.

The 54-meter-long vessel is expected to carry out the operations from May 16 to May 20, depending on the weather conditions and work progress.

Three electricity interconnectors with a total capacity of 4 GW are in service between France and the UK, including IFA 2000, commissioned in 1986, the 1 GW IFA2 , commissioned in January 2021, and the 1 GW ElecLink, commissioned in May 2022.

It was reported in February 2025 that the French Energy Regulatory Commission (CRE) and Great Britain’s independent energy regulator Ofgem had agreed to continue exploring further electricity interconnection development opportunities of around 1 GW capacity between the two countries.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingInterconnectorsSubseaSurveys & InterventionsVessels & VehiclesBusiness Developments & ProjectsInfrastructureOperations & MaintenanceOutlook & StrategyProject & TendersRegulation & Policy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies earmarks annual spend of up to $17 billion over next five years
  2. 2Fugro performs ultra-deepwater AUV survey off East Malaysia
  3. 3Southeast Asian oil field development clears key environmental hurdle to move toward FID
  4. 4‘Major’ oil & gas player awards Shearwater with three-year contract off South America

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free