Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›African oil field turns production switch back on after FPSO refurbishment
Fossil Energy

June 9, 2026 · about 3 months ago

African oil field turns production switch back on after FPSO refurbishment

Houston-based energy player Vaalco Energy has brought back online a field off the coast of Côte d’Ivoire, following an overhaul to extend the lifespan of a floating production, storage, and offloading (FPSO) vessel deployed at the African asset.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Baobab Ivoirien; Source: MODEC
FPSO Baobab Ivoirien; Source: MODEC

Houston-based energy player Vaalco Energy has brought back online a field off the coast of Côte d’Ivoire, following an overhaul to extend the lifespan of a floating production, storage, and offloading (FPSO) vessel deployed at the African asset.

Vaalco has confirmed the restart of production from the Baobab field on the CI-40 block, offshore Côte d’Ivoire, following the FPSO Baobab Ivoirien ’s revamp after the vessel ceased hydrocarbon operations in January 2025.

George Maxwell , Vaalco’s Chief Executive Officer, commented: “We are excited that the Baobab field on the CI-40 block offshore Côte d’Ivoire has restarted production in line with our projected timeline. We have the CI-40 block license extended through 2038 and believe that there is significant development drilling upside at Baobab.

“In early 2024, we had no assets in Côte d’Ivoire and now we have developed a strong position with development and exploration potential. We are at a critical junction, with successes in the Gabon drilling campaign and the Baobab field returning to production, and we believe that the remainder of 2026 will be very impactful.”

This content is available after accepting the cookies.

Once the nine-month refurbishment was completed in Dubai , the FPSO returned to Côte d’Ivoire in early Q2 2026 to be moored in position and reconnected to the field infrastructure.

As a result, production has resumed from four producing wells, with the remaining three producers expected to come online shortly. The company claims that the field is performing in line with its expectations.

The FPSO refurbishment was undertaken to extend the vessel’s life and ensure its long-term operational capacity, as a significant development drilling program at Baobab is planned to begin in the second half of 2026.

This Phase 5 drilling program is expected to include four producers, two to three injectors, and two workovers, providing potential meaningful additions to production from the main Baobab field.

Maxwell emphasized: “We remain focused on execution and driving meaningful growth through our organic capital programs that we believe will translate into value for our shareholders in 2026 and beyond.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies earmarks annual spend of up to $17 billion over next five years
  2. 2Fugro performs ultra-deepwater AUV survey off East Malaysia
  3. 3Southeast Asian oil field development clears key environmental hurdle to move toward FID
  4. 4‘Major’ oil & gas player awards Shearwater with three-year contract off South America

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free