Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Transocean’s drillship pair bags $550 million in new US Gulf deals
Business & Finance

October 19, 2026 · 1 hour ago

Transocean’s drillship pair bags $550 million in new US Gulf deals

Transocean has secured multi-well ultra-deepwater contracts for two drillships in the U.S. Gulf, extending operations through 2027.

MC

Melisa Cavcic

Senior Editor

1 minutes read
  • LinkedIn
  • X
  • Email
Drillship at sea
Deepwater Proteus drillship Source: Transocean

Switzerland-based offshore drilling contractor Transocean has added half a billion to its contract backlog after landing multi-well campaigns for two of its ultra-deepwater drillships in the Gulf of America (the U.S. Gulf of Mexico).

Transocean has revealed contract awards for two of its ultra-deepwater drillships in the U.S. Gulf, representing approximately $550 million in firm contract backlog. Both rigs share the same DSME 12000 design and were constructed by Daewoo Shipbuilding & Marine Engineering.

The 2015-built Deepwater Proteus drillship was awarded a ten-well contract with an undisclosed operator in the U.S. Gulf. With a maximum drilling depth of 40,000 feet (12,192 meters), the 11-year-old rig can operate in water depths of 10,000 feet (3,048 meters).

The estimated 700-day campaign is expected to contribute around $325 million in backlog and begin in the first quarter of 2027 in direct continuation of the rig’s current U.S. Gulf contract.

The 2016-built Deepwater Conqueror drillship was awarded a five-well assignment with an undisclosed operator in the U.S. Gulf. This 10-year-old rig shares identical high-spec capabilities as the Deepwater Proteus drillship.

The estimated 450 days of work is anticipated to contribute about $225 million in backlog, excluding mobilization fees, and start in the third quarter of 2027 in direct continuation of the rig’s program in Equatorial Guinea.

The latest contract wins come shortly after Transocean secured a combined $1.1 billion in offshore commitments with Shell and Equinor.

Related Articles

Rigs

Shell and Equinor fuel $1.1 billion backlog uptick for Transocean

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionRigsFossil EnergyOil & GasNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EU grant to cover 60% of investment for 10 MW tidal kite array in Ireland
  2. 2Eni and Libya’s National Oil Corporation turning on the taps at African gas project
  3. 3Transocean’s drillship pair bags $550 million in new US Gulf deals
  4. 4Fugro completes 2026 survey campaign for Ireland’s 900 MW offshore wind project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free