Advertisement

Subsea

about 7 years ago

ASCO Ships Wrap Up 2nd Stage of Absheron Pipe Laying

Azerbaijan Caspian Shipping CSJC (ASCO) has completed the second stage of pipe laying work in the Absheron gas and condensate field located in the Azerbaijan sector of the Caspian Sea. At this stage, an 8-inch pipeline with a length of 11,459 meters was layed in the Absheron area between jackets No.

1 minutes read

Azerbaijan Caspian Shipping CSJC (ASCO) has completed the second stage of pipe laying work in the Absheron gas and condensate field located in the Azerbaijan sector of the Caspian Sea.

At this stage, an 8-inch pipeline with a length of 11,459 meters was layed in the Absheron area between jackets No. 23 and No. 57.

Next stage includes pipe laying works at the Gas Separation Station No. 2 of the Bulla-Deniz field. It is planned to lay a pipeline with a length of 27 km.

The Suleiman Vazirov pipe-laying vessel and the Yarenga towing and supply vessel of the Caspian Sea Oil Fleet ASCO are used in pipe-laying works.

The Absheron gas and condensate field is located south-west of the block of Azeri-Chirag-Guneshli fields in the Caspian Sea at a depth of 500 meters. Pipe laying work was carried out at a depth of 8-12 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.