Advertisement

Fossil Energy

about 14 years ago

Coring to Start at Gurame SE-1XST Well (Indonesia)

MEO Australia Limited advises the following update in relation to the Gurame SE-1X well being drilled offshore North Sumatra in the Seruway PSC using the Hercules #208 drilling rig. Since the last report, 95/8″ casing has been run and cemented to 2,677mMDRT. After pressure testing of Blow-out Preven

1 minutes read

MEO Australia Limited advises the following update in relation to the Gurame SE-1X well being drilled offshore North Sumatra in the Seruway PSC using the Hercules #208 drilling rig.

Since the last report, 95/8″ casing has been run and cemented to 2,677mMDRT. After pressure testing of Blow-out Preventers and the 95/8″ casing, 8½” hole was drilled to 2,794mMDRT. Mudlog gas shows were observed to increase over the interval from 2,776mMDRT to 2,794mMDRT in the Baong sands.

In response to these gas shows, a 30m full-hole conventional core has been planned from 2,794mMDRT. At 2400 hours (Jakarta time) on 4th November operations were in progress to commence coring.

Progress since last report: – Ran and cemented 95/8″ casing to 2,677mMDRT

– Drilled 8½” hole to 2,794mMDRT Present Operation (at 2400hrs Jakarta time, 4th November)

– Preparing to cut 30m core from 2,794mMDRT Outlook:

Advertisement

– Complete coring and drill 8½” hole to base of Baong sands

[mappress]

November 5, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.