Advertisement

Dredging

about 8 years ago

Damen DOP200 for Amsterdam Job

On the North-Eastern outskirts of Amsterdam a vital lock complex controls the water levels and salinity of the inland waters. Recently, Paans Van Oord renovated the lock complex, which was a major challenge in the short time frame available. The full job lasted only 4 weeks, and the crammed program

1 minutes read

On the North-Eastern outskirts of Amsterdam a vital lock complex controls the water levels and salinity of the inland waters.

Recently, Paans Van Oord renovated the lock complex, which was a major challenge in the short time frame available.

The full job lasted only 4 weeks, and the crammed program included a wide range of renovation and repair jobs to the lock sill and lock head. In order to clean the lock bottom, the company used the DOP submersible dredge pump with a special suction head.

The DOP200 was mounted on the boom of a Liebherr R954C EW excavator, which had been placed on crane barge “Anna-Catharina”.

According to the company, only 3 days were required by the DOP200 and crew to clean the lock bottom – which has a surface of just over 1.000m². The sediment was pumped in a barge located alongside the crane barge, Damen said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.