Advertisement

Subsea

about 7 years ago

Fugro Wraps Up Final Stage of Saint-Nazaire Survey

Fugro has completed the final stage of geotechnical investigations to provide information for the detailed design of turbine foundations at the Saint-Nazaire offshore wind farm off the Atlantic coast of France. The owner and developer of the 480MW wind farm, Parc du Banc de Guérande SAS (PBG), is a

1 minutes read

Fugro has completed the final stage of geotechnical investigations to provide information for the detailed design of turbine foundations at the Saint-Nazaire offshore wind farm off the Atlantic coast of France.

The owner and developer of the 480MW wind farm, Parc du Banc de Guérande SAS (PBG), is a subsidiary of the EDF group and Canada’s Enbridge. A

Situated some 12km off the Loire-Atlantique coast of France, the Saint-Nazaire offshore wind is expected to power 20% of the Loire-Atlantique department.

Fugro performed the first geotechnical survey campaigns on the site in 2011, 2013 and 2015 surveying half the wind turbine positions and taking soil/rock samples.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.