Advertisement

Fossil Energy

about 12 years ago

PSA audits risk management on COSLPromoter

Between 24 June and 3 July 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of COSL Drilling Europe A/S and the company’s operations using the COSLPromoter semi-submersible drilling rig. The objective of the activity was to monitor that CDE has implemented a system to fulfil th

1 minutes read

Between 24 June and 3 July 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of COSL Drilling Europe A/S and the company’s operations using the COSLPromoter semi-submersible drilling rig.

The objective of the activity was to monitor that CDE has implemented a system to fulfil the regulatory requirements for risk management.

One non-conformity was identified in connection with the governing documents for emergency preparedness.

In addition, improvement points were identified in connection with: Risk and barrier management; Updating of documentation; Emergency preparedness manual; Emergency preparedness barriers; Simulator training; Maintenance; Doors; Working environment.

The COSLPromoter is a semi-submersible drilling rig built in 2012, designed to operate in water depths up to 750 meter. The unit is designed for North Sea/ Norwegian Sea and world – wide use in harsh environments. Station keeping is maintained by an 8 line mooring system or by dynamic position mode maintained by 6 fixed pitch, variable speed thrusters (DP3).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.