Americas

FPSO Atlanta; Source: Yinson Production
Fossil Energy

Brazilian firm awaits go-ahead for first oil as recently converted FPSO gets cleared for work

Brava Energia has obtained the required approval to deploy a floating production, storage, and offloading (FPSO) vessel for operations off the coast of Brazil and is now waiting to get a green light to start production at an oil field in the Santos Basin, where this FPSO will be in operation.

about 2 years ago
US Gulf Coast LNG bunker terminal secures gas supply
Alternative Fuels

US Gulf Coast LNG bunker terminal secures gas supply

The first dedicated LNG bunkering facility in the U.S. Gulf Coast, Galveston LNG Bunker Port (GLBP) – a joint venture between U.S. maritime infrastructure company Seapath and Houston-based clean energy solutions provider Pilot LNG – has formed a partnership with North American midstream company Ener

about 2 years ago
Design of BP's Kaskida FPU in Gulf of Mexico; Source: Exmar Offshore
Fossil Energy

BP enlists ABS for floating production unit destined to be deployed at its oil project in Gulf of Mexico

BP has tapped the American Bureau of Shipping (ABS) for a batch of services related to its floating production unit (FPU), which is destined to work at its sixth-operated deepwater project in a prolific high-margin basin within the U.S. Gulf of Mexico.

about 2 years ago
MMMCZCS
Clean Fuel

IRENA: Renewable hydrogen sector to potentially reshape global energy trade

The renewable hydrogen sector could play a crucial role in reshaping global energy trade, creating opportunities for new players, including developing countries, a new IRENA report found.

about 2 years ago
An illustration showing two onshore plants
Fossil Energy

New offtake deal takes Texas LNG project to FID-ready stage

Texas LNG, a subsidiary of Glenfarne Energy Transition has signed another heads of agreement (HOA) for a long-term supply of liquefied natural gas (LNG) from its proposed facility in Texas’ Port of Brownsville. Thanks to the latest agreement, the developer says it has the customer offtake commitment

about 2 years ago
DEME CVOW Export cable
Cabling

DEME starts installing export cable for 2.6 GW US offshore wind project

DEME Group has laid the first export cable for Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project, while also reaching a milestone by installing the 70th monopile foundation at the site off Virginia Beach in the U.S. As previously reported, Dominion Energy selected the consortium

about 2 years ago
An illustration of an LNG vessel next to a pier
Fossil Energy

Headwinds push Florida LNG project completion back five years to decade’s end

The United States Federal Energy Regulatory Commission (FERC) has granted Eagle LNG Partners, a Texas-based energy player, an extension of the deadline to finish the construction of the proposed small-scale liquefied natural gas (LNG) facility in Jacksonville, Florida.

about 2 years ago
Safe Concordia; Source: Prosafe
Fossil Energy

Flotel’s lengthened stay in Gulf of Mexico brings millions of dollars to Prosafe

Prosafe has won a charter extension with an undisclosed company for one of its semi-submersible vessels that will continue working in the U.S. Gulf of Mexico.

about 2 years ago
Rio Grande LNG
Fossil Energy

$18.4 billion gas project’s life on the line – Court ruling poses a threat to US LNG infrastructure buildout, developer says

A court ruling is said to have put a liquefied natural gas (LNG) export project at Texas’ Port of Brownsville in danger by revoking the reauthorization granted by the Federal Energy Regulatory Commission (FERC).

about 2 years ago
An illustration of an LNG terminal on the coast
Fossil Energy

Offtake deal bringing Mexican LNG to Oman

Amigo LNG, a Mexican subsidiary of Singapore’s LNG Alliance, has signed a binding heads of agreement (HOA) with OQ Trading (OQT), the trading arm of the national energy company of the Sultanate of Oman, to supply liquefied natural gas (LNG) from its liquefaction facility under development on Mexico’

about 2 years ago
Deepwater Atlas drillship; Source: Transocean
Fossil Energy

BP books Transocean’s first eighth-gen drillship for 365-day drilling program

Transocean has landed a new long-term assignment with the UK-headquartered oil major BP for the first of two eighth-generation drillships to join its rig fleet, which is also considered to be the world’s first drillship with a three-million-pound hook-load and 20,000 psi well control system.

about 2 years ago
Illustrated map of USA featuring potential carbon capture and storage infrastructure
Fossil Energy

Trust issues preventing US CCS industry from hitting full throttle in net-zero race, report warns

In the latest edition of a paper series examining the role of trust in the race to achieving net zero by using carbon capture and storage (CCS) in the United States, Australia’s engineering company Worley and researchers at Princeton University have found that distrust between stakeholders is one of

about 2 years ago