Germany

Prysmian
Subsea

Prysmian extends 30-year copper partnership with new supply agreement

about 1 month ago
Fit-out of NeuConnect’s converter stations in progress
Interconnectors

Fit-out of NeuConnect’s converter stations in progress

Fit-out works are currently underway on the converter stations in Germany and the UK for NeuConnect, a high-voltage submarine cable that will create the first direct energy transmission link between the two countries. The construction of the 24-meter-high, 70-meter-wide converter hall buildings reac

about 2 months ago
FSRU Energos Force; Source: DET
Clean Fuel

FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

A 294-meter floating storage and regasification unit (FSRU) has arrived at the new liquefied natural gas (LNG) terminal in Stade, marking the start of commissioning preparations and bringing the facility a step closer to operations, with gas feed-in to Germany’s grid expected from November.

about 2 months ago
Verlume Halo Subsea Battery Technology; Courtesy of Verlume
Fossil Energy

Verlume and SubCtech join forces to power up integrated subsea ops

UK-headquartered subsea power specialist Verlume and German marine technology company SubCtech are pooling resources to develop and deliver integrated subsea power solutions for offshore energy and defense applications.

about 2 months ago
Rendering of the Ruwais LNG concept design; Source: ADNOC
Alternative Fuels

Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Germany and the United Arab Emirates are stepping up energy cooperation, with German power producer RWE joining Abu Dhabi clean-energy firm Masdar and oil and gas giant ADNOC to pursue plans spanning more than €3 billion in potential offshore wind investment and advancing talks on long-term liquefie

about 2 months ago
Illustration; Source: Next Geosolutions
Offshore Wind

Italy’s NextGeo to open office in Germany

Italy-headquartered offshore survey specialist Next Geosolutions (NextGeo) is expanding into Germany with a new office to open in Bremen. According to the company, Bremen’s position at the heart of the North Sea maritime cluster and its growing marine technology community provide a strong environmen

about 2 months ago
Illustration; Source: German LNG Terminal
Clean Fuel

Nikkiso lands equipment deal for German LNG terminal

Cryogenic equipment supplier Nikkiso Clean Energy & Industrial Gases (Nikkiso CE&IG) Group has secured an order to deliver multiple pumps for a liquefied natural gas (LNG) terminal in Brunsbüttel, adding to its growing portfolio of equipment for Germany’s LNG import infrastructure.

about 2 months ago
German Federal Maritime and Hydrographic Agency opens offshore wind survey tender
Offshore Wind

German Federal Maritime and Hydrographic Agency opens offshore wind survey tender

Germany’s Federal Maritime and Hydrographic Agency (BSH) has launched a tender for preliminary geophysical investigation of offshore wind sites in Zones 3 and 4 of the German North Sea exclusive economic zone (EEZ). The contract, covering work in 2027 and 2028, will enable collecting seabed and subs

about 3 months ago
OEG secures corrosion protection contract for Gennaker offshore wind farm
Deepwater Installation

OEG secures corrosion protection contract for Gennaker offshore wind farm

OEG has secured a contract to provide a subsea corrosion protection system for the 976.5 MW Gennaker offshore wind farm in the German Baltic Sea, developed by Skyborn Renewables. The company will supply an Impressed Current Cathodic Protection (ICCP) system for the wind turbine foundations and is re

about 3 months ago
Ksi Lisims LNG concept; Source: Western LNG
Clean Fuel

Germany augments gas arsenal as Uniper pens 20-year LNG deal with Canadian project

German energy player Uniper has signed off on a two-decade-long liquefied natural gas (LNG) deal with a multibillion-dollar LNG project being developed on Canada’s northwest coast to export lower-carbon LNG to energy markets.

about 3 months ago
760-kilometer UK-Germany interconnector gets new owners, construction start expected in 2030
Cabling

760-kilometer UK-Germany interconnector gets new owners, construction start expected in 2030

Canada Pension Plan Investment Board (CPP Investments) and Elia Group, through its international development platform WindGrid, have acquired a subsea interconnector project that will link the UK and Germany from Copenhagen Infrastructure V, managed by Copenhagen Infrastructure Partners (CIP). Appro

about 4 months ago
Half of cabling in place for first UK-Germany energy link
Cabling

Half of cabling in place for first UK-Germany energy link

With over 350 kilometers of offshore and onshore cable laid, the NeuConnect high-voltage submarine cable that will create the first direct energy transmission link between the UK and Germany has reached the halfway point in its cabling program. The milestone comes as NeuConnect marks the third anniv

about 4 months ago