South & Central Asia
KrisEnergy finds no pay at Mancharee-1 (Thailand)
KrisEnergy Ltd., an independent upstream oil and gas company, has announced that drilling operations have concluded at the Mancharee-1 exploration commitment well in G10/48 in the Gulf of Thailand, where the Company is developing the Wassana oil field. Mancharee-1, which started drilling on 8 August
India: ministers discuss LNG terminal
A delegation led by the Chief Minister of Andhra Pradesh, N. Chandrababu Naidu met with the Minister of State for petroleum and natural gas, Dharmendra Pradhan, to discuss the issues concerning the petroleum sector. The matters like proposals to setting up a top-class petroleum University, setting u
UPDATE: Ningbo Port Dealing with Container Backlog
China’s Ningbo Port is back to business after a week-long strikes, staged by truck drivers unhappy with haulage rates, that brought the port operations to a standstill. The truck drivers are reported to have returned to work. At the moment, activities are underway to deal with the outstanding contai
Marine Insurers Wary of Arctic Shipping Routes
The melting of sea ice presents opportunities for international marine transportation networks in the Arctic, at least during the summer months. Recent discoveries of oil and the potential financial and time savings are making the Arctic routes more appealing to the shipping industry. Two viable Arc
Wuchang Chooses Ulstein PSV Design
Ulstein Design & Solutions has entered into an extensive contract with Wuchang Shipbuilding Industry Co., Ltd, China, on the delivery of ship design & equipment to four PX121 type platform supply vessels. Ship owner is the Singapore based Otto Offshore Ltd., who will receive all vessels in 2016. The
Infrastructure Technology Development Award for Grab Dredger
Sumitomo Heavy Industries Material Handling Systems Co., Ltd. and Yorigami Maritime Construction Co., Ltd. have developed design of a hybrid grab dredger that features Energy Fuel saving and Fully-Automatic Operation Systems. Their product recently received the 2014 Infrastructure Technology Develop
Summer Lull Not Over Yet for Newbuilds
The summer lull that took over the newbuilding market is not over yet, as prices for new ships are forecast to continue to soften, according to London-based shipbroker Gibson. The dowturn has stricken the tanker product orderbook the strongest, as explained by Gibson, with Tsakos Energy’s order for
Ulstein to deliver designs for four Otto Offshore’s PSVs
Ulstein Design & Solutions has entered into an extensive contract with Wuchang Shipbuilding Industry Co., Ltd, China, on the delivery of ship design & equipment to four PX121 type platform supply vessels. Ship owner is the Singapore based Otto Offshore Ltd., who will receive all vessels in 2016. The
CNOOC starts producing from Wenchang 13-6 oil field
CNOOC Limited has announced that its Wenchang 13-6 oilfield has started production. Wenchang 13-6 oil field, located in the west of Pearl River Mouth Basin with an average water depth of approximately 120 meters, is part of the Wenchang oilfields and shares the existing adjacent facilities for the d
Hallin Marine replaces mooring lines on COOEC’s FPSO
Hallin Marine, a Superior Energy Services company, has announced the highly successful outcome of a unique project for COOEC Subsea Technology, a wholly-own subsidiary of COOEC (China Offshore Oil Engineering Company). This assignment involved the replacement of nine mooring lines beneath the floati
Creation of New Lagoons Announced (Sri Lanka)
The Coast Conservation Department together with the Ministry of Fisheries and Aquatic Resources have taken steps to develop 18 lagoons in the island. The development of the new lagoons is scheduled for completion before the end of 2015. Arrangements are in place to remove unauthorized establishments
Thailand: Chiang Mai Prepares for Capital Dredging Project
Authorities in Chiang Mai Province have inspected the banks of the Ping River to talk with trespassers and have them move out before the start of river dredging to alleviate flooding problems along the river. The board will take about three months to observe the flow and characteristics of the river